As part of the CDM and Gold Standard requirements to include Simoshi under the ICSEA Programme of Activities (PoA), the institutional improved cook stoves have to be tested for efficiency and safety.
Following the audited testing protocols Water Boiling Test and Safety Test, this week we commenced the testing activities at the accredited laboratory Chemiphar. This is a meticulous process and as you can see form the pictures below, it involves a lot of measurements, attention and manpower as a saucepan with 70 litres of boiling water is removed from the stove for weighing.